1. Where the Sector Is Going
The Department has declared itself AI-first, adoption is counted in millions of users, and buying is concentrating in a few platforms and enterprise agreements.
Policy: An AI-first department
- Strategy: The January 2026 AI Acceleration Strategy sets 7 Pace-Setting Projects, each with a single accountable leader. Named projects include Swarm Forge (new ways of fighting with and against AI-enabled systems), Ender’s Foundry (AI-enabled simulation), Open Arsenal (turning technical intelligence into capability) and GenAI.mil.
- Enterprise platform: GenAI.mil launched in December 2025. By 1 May 2026 more than 1.3M Department personnel had used it, with tens of millions of prompts and hundreds of thousands of agents built.
- Classified networks: On 1 May 2026 the Department announced agreements to deploy frontier AI at Impact Level 6 and Impact Level 7 for “lawful operational use”. The list stands at 8 companies: SpaceX, OpenAI, Google, NVIDIA, Reflection, Microsoft, Amazon Web Services and Oracle, which was added after the first announcement.
- Frontier contracts: In mid-2025 the Department awarded 4 contracts worth up to $200M each to OpenAI, Anthropic, Google and xAI.
Programs: Where applications are bought
| Line or vehicle | Amount | What it buys |
|---|---|---|
| Command-and-control licenses and engineering support | More than $2B in the FY2027 request | Software for the combatant commands, the Joint Staff and the National Guard Bureau. More than $1.5B of it expands access to Maven Smart System, a program of record since March 2026. More than $1.9B a year is planned for FY2028 to FY2031. |
| Army Next Generation Command and Control | $2.9B of procurement in the FY2027 request | Digital command infrastructure for Army formations. |
| Army enterprise agreement with Palantir | Up to $10B over up to 10 years | Software and data services. Awarded 31 Jul 2025. Consolidates 75 contracts. The Army has said it is not committed to spending the full ceiling. |
| Army enterprise agreement with Anduril | Up to $20B over up to 10 years | Hardware, software and services. Consolidated more than 120 procurement actions in March 2026. |
| AI-Enabled Deterrence | $2.4B, mandatory request | Not funded without a reconciliation law. |
| AI Pace-Setting Projects | $0.5B, mandatory request | Cyber, intelligence reporting, manufacturing and maintenance automation. |
| Collaborative Combat Aircraft autonomy | Inside the $2.58B program request | Three finalists: Anduril, Shield AI and Collins Aerospace. A primary provider is chosen by summer 2027. |
Source: Department of War FY2027 budget documents, Army and Air Force announcements.
- Mid-size wins: The Army awarded Striveworks a contract for AI platform licenses with a $70M ceiling on 15 Jan 2026. The company announced on 22 Oct 2026 that the ceiling had been raised to about $700M over 5 years. A ceiling is the most the Army may order, not money obligated.
- Usage: Palantir said on its third-quarter call that Maven Smart System has passed 100,000 users.
Industry: The second customer
- Why industry buys: Missile frameworks call for output 3 to 4 times higher. Workforce attrition runs at about 15%. Prime backlogs are at records. Factories need output per person, and AI is one of the few levers.
- Proof point: In January 2026 Anduril signed a multi-year, factory-wide agreement with a seed-stage startup that generates work instructions from design data. The startup had raised $10.7M.
- Valuation signal: Hadrian, which sells software-defined manufacturing, raised $1.37B at a $7.87B valuation in August 2026.
2. Where the Money Is Going
The AI line is mostly government-owned compute that is not yet funded. The reachable money sits in program workflows, enterprise agreements, small-business awards and industry.
Source: Department of War FY2027 budget documents. Note: The full request for AI and joint command and control is $58.5B, of which $46.0B is the compute line. The lines shown are selected and do not sum to the total.
- Sovereign AI infrastructure ($46.0B): A government-owned compute backbone, regional compute centers and containerized tactical compute. It is 79% of the AI and command-and-control total and sits entirely in the mandatory request.
- Cyber: More than $20B in the FY2027 request.
- Autonomy: Drone Dominance is $53.6B in the mandatory request. Autonomy software rides inside it.
| Case | What it takes | What it means for this sector |
|---|---|---|
A. Full request $1.15T discretionary plus $350B mandatory | A new reconciliation law before the 120th Congress convenes on 3 Jan 2027. Senate Republicans urged one on 10 Nov 2026. Budget analysts rate it unlikely in the lame-duck session. | The compute build-out starts. Demand rises for software that runs on government-owned infrastructure. Pace-Setting Projects and AI-Enabled Deterrence are funded. |
| B. Base plus a small reconciliation | Regular appropriations near the House committee bill (about $1.072T), plus a smaller reconciliation package that adds no more than $60B to deficits over FY2027 to FY2036, the limit the House-passed budget resolution gives the Armed Services Committee. The Senate has not voted on its version. | Compute is deferred or scaled back. Application money stays inside programs such as command and control. Enterprise agreements carry most of the spend. |
| C. Extended continuing resolution | The continuing resolution that expires 11 Dec 2026 is extended into 2027. FY2026 rates apply. Absent a specific exception, the law bars new starts, production-rate increases and new multiyear procurements that use advance procurement funding for economic-order-quantity buys. The FY2027 budget documents list more than 150 new starts. | Absent a specific exception, no new starts. Buying continues through existing contracts, enterprise agreements and operations and maintenance money. New pilots wait. |
Source: Bastion Atlas planning constructs built on the public record (P.L. 119-103, H.R. 9495, H. Con. Res. 113). Note: The cases are not probability forecasts.
| Measure | Result | Reading |
|---|---|---|
| Total revenue | $2.313B, up 96% | First quarter above $2B. |
| US government revenue | $953M, up 96% on the year and 18% on the quarter | Defense software demand is compounding. |
| US commercial revenue | $984M, up 148% | Passed US government revenue for the first time. |
| Deals of $10M or more | 64 in the quarter | Large customers are buying platforms, not point tools. |
Source: Company results, 2 Nov 2026. Note: The company attributes growth in part to demand for “sovereign AI”.
Non-dilutive and venture money
- SBIR and STTR: Authority lapsed on 30 Sep 2025 and was restored on 13 Apr 2026 through 30 Sep 2031 (P.L. 119-83). Agencies may spend unused FY2026 funds in FY2027. The Department makes at least 2,250 awards a year, worth nearly $3B in FY2023.
- Strategic Breakthrough Awards: New awards of up to $30M over up to 48 months for firms with a prior Phase II. A 100% match is required. For Department awards, at least 20% of the match must come from new Department sources outside SBIR and STTR. Caps on proposals per company apply from FY2027.
- APFIT: Procurement funding of $10M to $50M per project for production-ready technology. A government organization must submit on the company’s behalf.
- Venture: Defense and defense-adjacent startups drew $35.4B in the first half of 2026 (PitchBook). In the second quarter the 10 largest rounds took 62% of deal value, and Series C deal value fell about 80% from the first quarter.
3. Geopolitics and Policy
Vendor terms of use, new oversight rules and authorization requirements now decide who can sell, not only who has the best model.
Vendor terms became a procurement risk
| Date | Event |
|---|---|
| 27 Feb 2026 | The Secretary directed that Anthropic be designated a supply chain risk after the company declined to remove 2 usage restrictions, on mass surveillance and on fully autonomous weapons. |
| 3-4 Mar 2026 | Two formal actions followed: A designation under 10 U.S.C. 3252 and a determination under 41 U.S.C. 4713, the Federal Acquisition Supply Chain Security Act. Anthropic challenged the first in federal district court in California and the second in the D.C. Circuit. |
| 1 May 2026 | The Department announced agreements with other vendors for classified networks. |
| 27 Aug 2026 | The California district court ruled the designation under 10 U.S.C. 3252 unlawful. |
| 25 Sep 2026 | A D.C. Circuit panel upheld the determination under 41 U.S.C. 4713 by 2-1. It did not review the California ruling, which concerns the other authority. The company remains barred for Department business, including use by contractors on Department work. |
| 13 Oct 2026 | Anthropic petitioned the D.C. Circuit for rehearing by the panel or by the full court. |
Source: Court rulings and Department announcements. Note: Litigation was continuing at the data cut-off. This exhibit states events and takes no position on the dispute.
- Implication for every vendor: Check which models your product calls and which are cleared for Department work. Contractors cannot use a barred vendor’s products on Department business.
- Design response: Architect so a model can be swapped without rewriting the product.
Congress is writing AI rules
- House bill: An AI incident and vulnerability reporting program, an AI Model Rapid Deployment Framework for onboarding and authorizing models on enterprise platforms, an updated policy on autonomous and AI-enabled systems, and software budgeting reform.
- Senate committee bill: Standards for human judgment, validation and testing of autonomous and AI-enabled weapons. An ecosystem for agentic AI at scale. AI data-center infrastructure on installations. Grants to help small and nontraditional firms pay for CMMC Level 2.
- Status: Neither is law. The Senate bill has not cleared the floor. Senator Elizabeth Warren, who has led oversight of military AI, gains influence in the Senate majority that takes over on 3 Jan 2027.
Acquisition and authorization
- Acquisition: Program Executive Offices are becoming Portfolio Acquisition Executives under a commercial-first policy. The FY2026 authorization act expanded commercial solutions openings. An Army directive of August 2026 puts commercial software first. A Deputy Secretary memorandum of 14 Sep 2026 directs the Department to apply statutory cost-accounting relief for nontraditional contractors.
- Cloud authorization: FedRAMP has prioritized AI cloud services since August 2025. Its 20x pilot at the Moderate level drew 14 qualifying submissions, with first authorizations on 6 Mar 2026 and 6 more by 27 Apr 2026. Department authorizations at Impact Level 4 and 5 are issued on top of FedRAMP.
- Cybersecurity: CMMC Phase II is suspended with no new date. Phase I self-assessment and DFARS 252.204-7012 still apply.
- Continuing resolution: Absent a specific exception, no new starts while it runs. It expires on 11 Dec 2026 and an extension is the common expectation.
War and allies
- Iran war: The war cost about $38B through 1 Aug 2026, and $21.7B is needed to replace munitions. Software competes with that bill inside the same budget.
- Allies: NATO members are estimated to spend more than $1.8T in 2026. Palantir names demand for “sovereign AI” as a growth driver.
4. Competitive Landscape
Frontier model vendors and 2 platform holders control access to users. A startup wins as an application, a partner or a supplier to the companies that build hardware.
| Layer | Players | Opening for a startup |
|---|---|---|
| Frontier models | OpenAI, Google, SpaceX, Microsoft, Amazon Web Services, Oracle, NVIDIA, Reflection | Build on top. Stay portable across at least 2 cleared models. |
| Platforms and enterprise agreements | Palantir, Anduril | They hold the vehicles and the data layer. Enter as an application or a partner on their platforms. |
| Government compute | The planned sovereign AI infrastructure | Software that deploys, monitors and secures models on government-owned compute. |
| AI specialists with programs | Striveworks and peers | The ceiling on the January 2026 contract rose from $70M to about $700M in 9 months, by the company’s account. A ceiling is not an order. |
| Primes and Tier 1 manufacturers | Lockheed Martin, RTX, Northrop Grumman, General Dynamics, HII and their suppliers | Buyers of engineering, production, quality and supply-chain AI. Budgets come from backlog, not appropriations. |
Source: Public contract announcements and company results. Note: The opening column is Bastion Atlas assessment.
- Fewer, larger contracts: When 75 contracts become 1, the holder of that agreement has a large say in which applications reach users.
- Compliance as a moat: Rules on incident reporting, testing and human judgment raise the cost of entry and favor firms that document early.
- Compliance as a market: The 1 Jan 2027 supply-chain restriction on magnets, tungsten and tantalum and the mapping rules that Executive Order 14415 directs the Department to write create demand for supply-chain intelligence tools across defense manufacturers.
5. Best Plays for the Next 12-24 Months
The 8 plays below assume the compute build-out is delayed and that buying continues through platforms, programs and industry. Each rests on the evidence in Sections 1 to 4.
1. Be model-agnostic and run where the government runs
Window: Now
Why now (the evidence)
- Eight vendors hold agreements for classified networks
- One vendor barred for Department business
- A request of $46.0B for government-owned compute
- The Department’s agreements are written for lawful operational use
Move in the next 90 days
- Abstract the model layer and test on 2 or more cleared models
- Support on-premises and disconnected deployment
- Write down how your terms of use meet the Department’s standard
2. Attach to a funded workflow
Window: FY2027
Why now (the evidence)
- More than $2B requested for command-and-control software
- Army command and control procurement of $2.9B
- Pace-Setting Projects name cyber, intelligence reporting, manufacturing and maintenance
- Readiness request of $190B
Move in the next 90 days
- Choose 1 workflow with a budget line and a named owner
- Measure hours and errors removed in a pilot
- Use a commercial solutions opening to contract the pilot
3. Enter through an enterprise vehicle or a prime
Window: Now to 2028
Why now (the evidence)
- The Army merged 75 contracts into 1 agreement worth up to $10B
- A second Army agreement is worth up to $20B
- Palantir closed 64 deals of $10M or more in 1 quarter
Move in the next 90 days
- Become an application partner on the platforms that hold the agreements
- Subcontract to the prime on a program you can improve
- Keep your own data rights and brand in the agreement
4. Sell to industry first
Window: Now
Why now (the evidence)
- Missile output targets 3 to 4 times higher
- Workforce attrition of about 15%
- A seed-stage firm won a multi-year factory-wide deal in January 2026
- Industry revenue does not wait for an appropriation
Move in the next 90 days
- Target manufacturing engineering, quality and supply-chain mapping
- Price on output gained, not seats
- Carry those references into government sales
5. Start authorization early
Window: Next 2 quarters
Why now (the evidence)
- FedRAMP is prioritizing AI services and running a faster 20x path
- Impact Level 4 and 5 authorizations sit on top of FedRAMP
- Phase I of CMMC and DFARS 252.204-7012 apply now
Move in the next 90 days
- Pick the route: Your own authorization or inheritance from an authorized platform
- Find a sponsor for a facility clearance if your use case needs one
- Hold CMMC Level 2 readiness for prime flow-downs
6. Stack non-dilutive money in order
Window: FY2027 to FY2028
Why now (the evidence)
- SBIR and STTR are authorized through 30 Sep 2031
- Strategic Breakthrough Awards run up to $30M and require a 100% match
- APFIT provides $10M to $50M per project
- Unused FY2026 SBIR funds can be spent in FY2027
Move in the next 90 days
- Sequence: Phase II, then a Breakthrough award, then APFIT, then a program line
- Line up the matching investors before you apply
- Recruit the government sponsor APFIT requires
7. Document for oversight before you are asked
Window: 2027
Why now (the evidence)
- House bill creates AI incident and vulnerability reporting
- Senate bill sets human-judgment, validation and testing standards
- Oversight of military AI gains weight in the new Senate majority
Move in the next 90 days
- Keep test and evaluation evidence for every release
- Write the incident response and reporting plan now
- Show where a human decides, and log it
8. Plan for a continuing resolution
Window: Next 6 months
Why now (the evidence)
- The continuing resolution expires 11 Dec 2026 and, absent a specific exception, bars new starts
- An extension into 2027 is the common expectation
- Existing vehicles and maintenance money keep moving
Move in the next 90 days
- Aim near-term bids at existing contracts and enterprise agreements
- Hold cash for at least 2 more quarters than planned
- Be ready to sign the day a new start is released
Source: Evidence items are facts from the public record as of 18 Nov 2026. Note: The plays are Bastion Atlas analysis.
6. Dates to Watch
Source: Public laws, budget documents and Department of War announcements listed in Exhibit 9.
| Date | Event | Why it matters |
|---|---|---|
| 11 Dec 2026 | Continuing resolution (P.L. 119-103) expires | A further extension keeps FY2026 rates and, absent a specific exception, the section 102 bar on new starts, production-rate increases and certain new multiyear procurements. |
| 1 Jan 2027 | DFARS 252.225-7052 extends to the full supply chain | The sourcing restriction on samarium-cobalt and neodymium-iron-boron magnets, tungsten and tantalum from China, Russia, Iran and North Korea reaches back to mining and refining, at every contract tier. Exceptions include certain commercial off-the-shelf items and nonavailability waivers. |
| By 3 Jan 2027 | Last window for a reconciliation law in the 119th Congress | Decides whether the $46.0B compute line, AI-Enabled Deterrence and the Pace-Setting Projects are funded. |
| 3 Jan 2027 | 120th Congress convenes with Democratic majorities in both chambers | New chairs at House and Senate Armed Services (Adam Smith, Jack Reed). Expected oversight topics at House Armed Services: Golden Dome, munitions stockpiles and government equity deals. |
| By 1 Feb 2027 (statutory date) | FY2028 President’s Budget due | Shows whether the FY2027 ramp carries forward. The current out-year path falls to $1.28T in FY2028 without new reconciliation money. |
| Summer 2027 | Primary mission-autonomy provider chosen for Collaborative Combat Aircraft | Largest single decision in military autonomy software. |
| 1 Oct 2027 | Target date for the Autonomous Warfare Command | A single 4-star customer for autonomy. Its own budget and acquisition authority depends on legislation. |
| FY2028 to FY2031 | More than $1.9B a year planned for mission command applications | A multi-year market for command-and-control software. |
| 30 Sep 2031 | SBIR and STTR authority expires | A 5-year runway for the small business programs. |
Source: Public laws, bills, budget documents and Department of War announcements.
What would change this view
- Upside: Funding for the sovereign compute line, which would open a market for software that runs on it. A rapid deployment framework in the final authorization act.
- Downside: New restrictions on model vendors, or a model your product depends on losing access to Department work.
- Watch: Hearings on military AI in the 120th Congress, the next enterprise agreements, and which applications the platform holders admit.
About This Report
- Scope: AI software and services sold to the Department of War and to the defense industrial base, with the policy and authorization rules that govern entry. Data cut-off: 18 Nov 2026.
- Evidence base: Department of War FY2027 budget documents and its January 2026 AI strategy, Congressional Research Service and Congressional Budget Office reports, the FY2027 defense authorization bills, federal court rulings, agreement announcements from the Department of War and the Army, FedRAMP releases, Palantir’s third-quarter 2026 results, company announcements, PitchBook venture data and NATO estimates. SONAR’s continuously updated intelligence layer was the signal source, through the 46 SONAR reports issued between 30 Aug and 18 Nov 2026.
- Verification rule: Every figure met 1 of 2 tests before use. It was read from the primary document where that document is public, or it was confirmed in at least 2 independent accounts of an official announcement or company statement. Headline figures were then checked a second time against the source. This edition also reflects an independent line-by-line fact check, with each challenge tested against the primary document before any change was made. Figures that failed a pass were corrected or removed.
- Request is not appropriation: Unless marked as enacted, FY2027 figures are the President’s Budget request of 3 Apr 2026. Mandatory figures depend on a reconciliation law that has not been passed.
- Company figures: Backlog, guidance, targets and framework agreements are as stated by the companies. Framework agreements remain subject to congressional authorization and appropriations.
- Analysis: The “Bottom Line”, section lead-ins, “So what” notes, planning cases and plays are Bastion Atlas judgment built on the facts above.
Key public documents behind the figures
- Department of War, FY2027 Budget Request briefing and Overview Book (April 2026)
- Department of War, FY2027 Mandatory Funding Overview
- Congressional Research Service, R49023 (FY2027 request for selected weapon systems)
- P.L. 119-103, Continuing Appropriations and Extensions Act, 2027 (Division A, section 102)
- Congressional Budget Office, cost estimate for operations against Iran (15 Sep 2026)
- House Appropriations Committee, FY2027 defense bill summaries (June 2026, H.R. 9495)
- H.R. 8800 and S. 4784 (FY2027 defense authorization bills) and H. Con. Res. 113 (House budget resolution)
- Department of War, AI Acceleration Strategy (January 2026)
- Department of War, announcement of frontier AI agreements for classified networks (1 May 2026)
- Department of the Army, enterprise agreement announcements (31 Jul 2025 and March 2026)
- Palantir, third-quarter 2026 results (2 Nov 2026)
- Court rulings of 27 Aug 2026 (Northern District of California) and 25 Sep 2026 (D.C. Circuit) on the supply chain risk designation, and the petition for rehearing of 13 Oct 2026
- P.L. 119-83 (SBIR and STTR reauthorization, 13 Apr 2026) and Congressional Research Service IN12705
- FedRAMP, 20x Phase 2 pilot results (March to April 2026)
- Deputy Secretary of War, memorandum of 14 Sep 2026 on the industrial base
- Department of War, memorandum suspending CMMC Phase II (July 2026)
- Executive Order 14415 (20 Jul 2026) and DFARS 252.225-7052
- PitchBook, defense technology venture report for the second quarter of 2026
- Hadrian, Series D announcement (6 Aug 2026)
