InsightsDefense Aviation

Sector Intelligence Report

Defense Aviation

Where the sector is going, where the money is going, and the best plays for the next 12-24 months

Data as of
18 Nov 2026
Written for
Tier 1 suppliers to the primes and the tiers below
Prepared by
Bastion Atlas

Key figures

  • $102BFY2027 air power request, up 26% on FY2026
  • 85F-35s requested for FY2027, against 47 in FY2026
  • 32 + 53F-35s in the base budget, and F-35s that need a new reconciliation law
  • 156 a yearF-35 rate planned for 10 years under the Lots 21-30 framework, which Congress has not yet funded
  • $292.0BLockheed Martin backlog at Q3 2026, a record
  • >$20BF/A-XX development award to Boeing on 29 Sep 2026
  • ~1,000Collaborative Combat Aircraft the Air Force intends to buy over time
  • 1,509Combat-coded fighters the Air Force says it needs by 2035, against 1,271 in FY2026

Bottom Line

  • Demand is real and contracted.

    The FY2027 request puts $102B into air power and asks for 85 F-35s against 47 in FY2026. Order backlogs are at records: Lockheed Martin $292.0B, RTX $340B, Northrop Grumman $109.6B.

  • The top of the ramp is not funded yet.

    Of the 85 F-35s, 53 sit in a $350B mandatory request that needs a new reconciliation law, along with $3.0B of F-35 sustainment. The House-passed budget resolution would let the Armed Services Committee add no more than $60B to deficits over 10 years. Democrats take both chambers on 3 Jan 2027.

  • The continuing resolution holds rate.

    Funding runs at FY2026 levels to 11 Dec 2026. Absent a specific exception, the law bars new starts, production-rate increases and new multiyear procurements that use advance procurement funding for economic-order-quantity buys. A further extension into 2027 is the common expectation.

  • The platform mix is turning over.

    Boeing now holds both crewed sixth-generation fighters. Collaborative Combat Aircraft are under production contract with 2 vendors. Army legacy helicopter buys fall close to zero. The Navy is planning the shutdown of the F/A-18E/F and EA-18G lines.

  • Best position for 2027-2028:

    Anchor revenue on lines in the base budget request (32 F-35s, 24 F-15EX, 15 KC-46A). Treat the F-35 rate of 156 a year in the Lots 21-30 framework as a planning assumption until Congress authorizes and funds it. Win a qualified position on F-47, F/A-XX and Collaborative Combat Aircraft while supply chains are still forming. Treat reconciliation-funded volume as upside, not base case.

1. Where the Sector Is Going

Three shifts are under way at once: Sixth-generation fighters are entering hardware, a 10-year framework sets planned F-35 volume, and uncrewed combat aircraft have become a production program.

Sixth generation moves from design to hardware

  • F-47 (Air Force): In engineering and manufacturing development. First flight expected as early as 2028. At least 185 aircraft planned. FY2027 request: $5.04B.
  • F/A-XX (Navy): Awarded to Boeing on 29 Sep 2026. The full-scale development contract is valued at more than $20B and covers multiple test aircraft. The aircraft replaces the F/A-18E/F and EA-18G from the 2030s. FY2026 appropriations provided $972M to enable the award.
  • Legacy line closure: On the same day, Boeing received $16.7M to plan the shutdown of F/A-18E/F and EA-18G production.
  • B-21: A 23 Feb 2026 agreement expands annual production capacity by 25%, funded with $4.5B from the 2025 reconciliation law. First aircraft arrives at Ellsworth Air Force Base in 2027. The fleet objective stays at 100. Northrop Grumman has committed about $2.5B to expand B-21 production capacity.

A 10-year framework sets planned fifth-generation volume

  • F-35 framework (22 Oct 2026): A 10-year agreement covering Lots 21-30 and at least 850 aircraft for the US services, plus international orders. Production is planned at 156 aircraft a year. Initial spares, modification kits and sustainment are folded in. Lockheed Martin agreed to invest at least $7B in F-35 initiatives. The framework is not a funded multiyear award. It is subject to congressional authorization and appropriations.
  • The arithmetic: At 850 aircraft over 10 years, the US buy averages 85 jets a year, the same quantity as the FY2027 request.
  • Friction on Lot 20: Lockheed Martin disclosed that its costs began to exceed contractual authorization on the Lot 20 advance acquisition contract in the third quarter of 2026. Lots 20-22 are still under negotiation.
  • F-15EX: The FY2027 request is for 24 aircraft ($3.85B), against 22 in FY2026. Lot 7 production was finalized on 29 Sep 2026 at $2.38B. The line reaches a maximum of 24 a year by FY2027 and could reach 36 a year with added facilities funding.

Uncrewed combat aircraft are now a production program

  • Increment 1: On 17 Jun 2026 the Air Force awarded production and development contracts to both General Atomics (FQ-42A) and Anduril (FQ-44A), 4 months ahead of schedule. The Air Force intends to buy about 1,000 Collaborative Combat Aircraft over time, with more than 150 by the end of the decade.
  • Autonomy: Six companies hold places in the mission-autonomy pool. Three of them (Anduril, Shield AI and Collins Aerospace) advanced to compete for primary provider, which is to be named by summer 2027.
  • Increment 2: Nine initial contracts awarded, with more than 20 companies eligible. The FY2027 request covers the whole program: It funds Increment 1 and begins development of Increment 2. The Congressional Research Service puts it at $2.58B.

Army aviation pivots from legacy rotorcraft to MV-75

Exhibit 1Army aviation money is leaving legacy helicopters for MV-75Army aviation procurement, FY2026 level against the FY2027 request
ProgramFY2026FY2027 requestDirection
AH-64 Apache$361.7M$1.5MNo new aircraft requested
UH-60 Black Hawk$913M$39.3MThe request funds 1 aircraft. The House appropriations bill adds $493M for 12 more.
CH-47 ChinookAbout $629M$210MCut by about 67%
MV-75 (future long-range assault aircraft)Not stated$2.1B development plus $127M procurementFirst unit equipped in FY2030

Source: Department of War FY2027 budget documents, House Appropriations Committee and House Armed Services Committee bills. Note: FY2026 figures are the prior-year levels the request is measured against. FY2027 figures are requested, not appropriated. The House authorization bill adds $250M for 6 more Black Hawks.

The fighter gap keeps the demand signal long

  • Requirement: The Air Force told Congress on 16 Oct 2026 that it needs 1,509 combat-coded fighters by 2035. Its FY2026 inventory by the same counting method is 1,271.
  • Legal floor: Statute requires 1,145 primary mission fighters. The Air Force notified Congress of 1,098 in May 2026, 47 short. The average fighter is about 27.4 years old.
  • Buy rate: The service has long said it needs 72 new fighters a year. The FY2027 request buys 62 (38 F-35A and 24 F-15EX).

2. Where the Money Is Going

The request is large, but the top of the ramp depends on a reconciliation law that has not passed. Plan on the base budget and treat the rest as upside.

The FY2027 President’s Budget (3 Apr 2026) requests $1.5T for national defense: $1.15T discretionary plus $350B mandatory. Procurement ($413.1B) and research and development ($343.7B) total $756.8B, or 52.2% of the Department of War topline.

  • Navy aircraft procurement: $34.4B, of which $7.5B is in the mandatory request. That is up from $17.75B in FY2026 and now larger than Air Force aircraft procurement ($30.6B).
  • Air Force research and development: About $74.2B, against about $57B in FY2026. Air Force missile procurement rises from $6.3B to $11.4B.
  • Not requested: The E-7 Wedgetail has no funding in the request. The Senate Armed Services and House Appropriations committees would add it.
Exhibit 2Only 32 of the 85 F-35s requested for FY2027 sit in the base budgetF-35 quantities by funding type (aircraft)

Source: Department of War FY2027 budget overview and Mandatory Funding Overview, House Appropriations Committee. Note: The House committee bill funds the 32 base-budget aircraft at $6.9B. The Lots 21-30 framework assumes an average of 85 US aircraft a year.

Exhibit 3The largest aviation lines, and the ones that depend on reconciliationFY2027 request, selected aviation programs
ProgramFY2027 requestQuantityNote
F-35 (all variants)$6.9B in the base budget for 32 aircraft. $6.71B in the mandatory request for 53.8538 F-35A, 10 F-35B, 37 F-35C. The mandatory request carries 14 of the A models, all 10 B models and 29 of the 37 C models.
F-15EX$3.85B2422 in FY2026
F-47$5.04BDevelopmentFirst flight as early as 2028
Collaborative Combat Aircraft$2.58BNot stated2 vendors under production contract since June 2026
B-21$6.11BNot statedProduction capacity up 25%
KC-46A$4.42B15
E-2D$3.20B6
CH-53K$4.08B22
KC-130J$1.19B (mandatory request)7Depends on reconciliation

Source: Department of War FY2027 budget overview, Department of War FY2027 Mandatory Funding Overview, Congressional Research Service R49023, House Appropriations Committee.

Exhibit 4Aircraft are 19% mandatory. Missile defense is 64%FY2027 request for selected weapon systems, discretionary against mandatory ($B)

Source: Congressional Research Service R49023. Note: The 4 largest categories, selected programs only. They cover $73.6B of a $102.2B aircraft category and $43.5B of an $82.2B missile defense category.

Exhibit 5Aviation lines worth $14.43B sit in the unfunded mandatory requestThe Air Superiority category inside the $350B mandatory request
LineRequestContent
F-35 procurement$6,713M53 aircraft: 14 F-35A, 10 F-35B, 29 F-35C
F-35 sustainment$3,005MSpares and support
F-35 development$1,300M
KC-130J$1,190M7 aircraft
F-35 modifications$324M200 Block 4 kits
F-35 Engine Core Upgrade$260M
Other lines (10)$1,637MF-35 full-funding lines, digital core, flight science aircraft and thermal management upgrade, F/A-XX development, 3 B-52 lines
Category total$14,430M16 lines

Source: Department of War FY2027 Mandatory Funding Overview. Note: None of this is funded unless a reconciliation law passes. Lines are rounded in the source and sum to $14,429M.

Exhibit 6Plan against 3 funding cases, not 1FY2027 funding cases and what each means for this sector
CaseWhat it takesWhat it means for this sector

A. Full request

$1.15T discretionary plus $350B mandatory

A new reconciliation law before the 120th Congress convenes on 3 Jan 2027. Senate Republicans urged one on 10 Nov 2026. Budget analysts rate it unlikely in the lame-duck session.85 F-35s, the mandatory sustainment and modification lines, and 7 KC-130Js are funded. Primes release long-lead orders against the full ramp.
B. Base plus a small reconciliationRegular appropriations near the House committee bill (about $1.072T), plus a smaller reconciliation package that adds no more than $60B to deficits over FY2027 to FY2036, the limit the House-passed budget resolution gives the Armed Services Committee. The Senate has not voted on its version.Discretionary lines carry the year: 32 F-35s plus whatever appropriators add, 24 F-15EX, F-47, Collaborative Combat Aircraft and B-21. The House committee bill is $3.2B below the request on selected weapon systems.
C. Extended continuing resolutionThe continuing resolution that expires 11 Dec 2026 is extended into 2027. FY2026 rates apply. Absent a specific exception, the law bars new starts, production-rate increases and new multiyear procurements that use advance procurement funding for economic-order-quantity buys. The FY2027 budget documents list more than 150 new starts.Planning assumption: Buys stay near FY2026 quantities (47 F-35s, 22 F-15EX), because a production-rate increase needs an exception. New-start awards wait. Cash flow shifts right for suppliers on ramping programs.

Source: Bastion Atlas planning constructs built on the public record (P.L. 119-103, H.R. 9495, H. Con. Res. 113). Note: The cases are not probability forecasts.

Exhibit 7The primes hold record backlogs and are putting in their own capitalThird-quarter 2026 results
CompanySalesBacklogSignal for suppliers
Lockheed Martin$20.7B, up 11%$292.0B, up 27% on the prior quarter2026 sales outlook raised to $80-82B. Agreed to invest at least $7B in F-35 initiatives. Lot 20 costs running ahead of contract authorization.
RTX$25.0B, up 11%$340B: $164B defense, $176B commercialMore than $81B of commercial and defense awards in the quarter, nearly $59B of it defense. 2026 sales outlook raised to $97.0-97.5B.
Northrop Grumman$11.1B, up 7%$109.6B, up 20% on the yearAwards of $16.4B in the quarter. 2027 sales growth guided at 5-7%. About $2.5B committed to B-21 capacity.
BoeingCompany revenue $24.2BCompany backlog $745BDefense segment margin 6.2%, against 1.7% a year earlier, helped by a $252M gain on a divestiture. Prime on F-47, F/A-XX and F-15EX.

Source: Company third-quarter 2026 results, 20-27 Oct 2026.

Exhibit 8Order backlogs are at records across the primesBacklog at the end of the third quarter of 2026 ($B)

Source: Company results. Note: Boeing and RTX totals include commercial aerospace.

3. Geopolitics and Policy

The Iran war, a divided Congress and allied rearmament pull in different directions. Munitions and readiness now compete with new aircraft for the same dollars.

The Iran war reset priorities and stockpiles

  • Cost: Operation Epic Fury began on 28 Feb 2026. The Congressional Budget Office (15 Sep 2026) put the cost at about $38B through 1 Aug 2026, rising by $2-3B a month.
  • Stockpiles: Replacing expended munitions will take $21.7B. The US used an estimated one-half to two-thirds of its inventory of certain interceptors since June 2025. Rebuilding takes at least 5 years, even at higher production rates.
  • Funding gap: The FY2026 supplemental request of nearly $70B ($67.1B for the Department of War) has not been enacted. It includes $21B to speed munitions buys and expand production lines. Democrats broadly oppose more funding for the conflict.
  • Effect on aviation: Readiness funding rises to $190B in the request. Air-launched weapons and sustainment compete with new aircraft for the same dollars and, in many cases, the same suppliers.

A divided calendar in Congress

  • Election: Democrats won the House and the Senate on 3 Nov 2026. The base request is $242.4B (28%) above the FY2026 defense appropriations act.
  • Authorization: The House passed its FY2027 defense authorization bill (H.R. 8800) on 22 Jul 2026 at $1.15T. The Senate bill (S. 4784) was reported in June and has not cleared the floor. Open items include multiyear authority for munitions (13 programs in the House bill, 19 in the Senate bill), right-to-repair and limits on buybacks and dividends.
  • Multiyear for fighters: The Air Force is seeking multiyear contracts for the F-35 and F-15EX. The Senate committee bill carries that authority. For the F-15EX it applies only after the Air Force certifies that Boeing can produce at rate.
  • Out-years: The administration’s own path falls from $1.5T to $1.28T in FY2028 and reaches only $1.35T by FY2031 without new reconciliation money.

Allied demand is the second engine

  • NATO: The 32 allies are estimated to spend more than $1.8T in 2026, up about 11%. Germany is at about $147B, the United Kingdom about $110B, France about $80B and Poland about $53B. Five allies exceed 3.5% of GDP. The Hague commitment is 5% of GDP by 2035.
  • US exports: Authorized arms transfers reached $331.2B in FY2025. Direct commercial sales rose about 13% to $226.8B. Foreign Military Sales fell about 11% to about $104B.
  • Europe: The European Union’s SAFE instrument offers EUR150B in loans to 2030. Oxford Economics estimates that about 40% of EU defense equipment spending is imported from outside the bloc.
  • F-35: The Lots 21-30 framework counts international orders inside the 156-a-year rate.

Materials and trade

  • Magnets and metals: From 1 Jan 2027, the DFARS 252.225-7052 restriction on samarium-cobalt and neodymium-iron-boron magnets, tungsten and tantalum from China, Russia, Iran and North Korea reaches back to mining and refining. It applies to prime contracts and subcontracts at any tier. Exceptions include certain commercial off-the-shelf items and nonavailability waivers, which Executive Order 14415 restricts.
  • China: Beijing extended the suspension of its October 2025 export controls only to 10 Jan 2027. The April 2025 license controls on 7 rare earths remain in force.
  • Tariffs: Section 232 duties on steel and aluminum remain at 50%.

4. Competitive Landscape

Boeing holds both crewed sixth-generation fighters. The most open supply chains belong to the new platforms and to the uncrewed aircraft builders.

Exhibit 9The open supplier windows are on the new platforms, not the mature production linesWho holds what, and where the supplier window stands
PlatformPrimeStatusSupplier window
F-35Lockheed MartinFramework for Lots 21-30 at 156 a year, not yet fundedThe planned rate is stable. Compete on cost, second-source positions and sustainment content.
F-47BoeingDevelopment. First flight as early as 2028.Open. Development is when production suppliers are qualified.
F/A-XXBoeingDevelopment contract awarded 29 Sep 2026Early. Sourcing decisions follow the award.
Collaborative Combat Aircraft, Increment 1General Atomics, AndurilUnder production contract since June 2026Now. Rate tooling, low-cost structures and subsystems.
Collaborative Combat Aircraft, Increment 29 initial contractsConcept and designOpen. More than 20 companies are eligible.
B-21Northrop GrummanProduction. Capacity up 25%.Capacity additions through 2027.
F-15EXBoeing24 a year, up to 36 with facilities fundingTied to appropriations and multiyear authority.
MV-75Bell TextronDevelopment. First unit equipped FY2030.Open for production-phase content.
F/A-18E/F and EA-18GBoeingLine shutdown being plannedShift to spares and sustainment.

Source: Program announcements and budget documents. Note: The supplier-window column is Bastion Atlas assessment.

  • Boeing: Prime on both crewed sixth-generation fighters and on F-15EX, with defense margins recovering. Its fighter enterprise is the largest new sourcing opportunity of the next 3 years.
  • Lockheed Martin: A planned F-35 rate through Lot 30, pending appropriations, and a record backlog, with pressure to take cost out as it invests at least $7B of its own.
  • New production entrants: Anduril and General Atomics now hold production contracts for combat aircraft. Shield AI showed its first full-scale X-BAT prototype on 4 Nov 2026, targets production in 2029 and agreed to buy radar maker Echodyne for $5.3B. These firms buy on commercial terms and value speed and price over heritage.
  • Engines: GE Aerospace won an F414 support contract worth up to $2.9B and has about 30,000 military engines in service. The F-35 Engine Core Upgrade has a $260M line in the mandatory request.
  • Capacity competition: Commercial aerospace is ramping on the same forgings, castings and electronics. In a Roland Berger survey of 95 European aerospace companies in early 2026, 55% still reported sizable supply-chain issues, especially in meeting rising demand. GE Aerospace has agreed to buy castings maker Consolidated Precision Products.
  • Deals: White & Case and Mergermarket recorded 65 defense mergers and acquisitions worldwide in the first 9 months of 2026, more than in all of 2025 and the most in data going back to 2018. Combined value was $7B.

5. Best Plays for the Next 12-24 Months

The 7 plays below are ordered by how much of the outcome a supplier controls. Each rests on the evidence in Sections 1 to 4.

Exhibit 10Seven plays for Tier 1 suppliers and belowWhat to do, why the evidence supports it, and the first move
PlayWhy now (the evidence)Move in the next 90 days
  1. 1. Anchor on the base budget lines

    Window: Now to FY2028

    Why now (the evidence)

    • The base budget request holds 32 F-35s, 24 F-15EX, 15 KC-46A, 6 E-2D and 22 CH-53K
    • The Lots 21-30 framework plans F-35 output at 156 a year but is not a funded award
    • Senate committee bill carries multiyear authority for F-35 and F-15EX

    Move in the next 90 days

    • Split your 2027 order book by funding type: Discretionary, mandatory, international
    • Ask each prime which lot quantities sit behind your purchase orders
    • Model long-term agreements at 2 rates: The base budget buy and the 156-a-year framework rate
  2. 2. Qualify on sixth generation while supply chains form

    Window: 2026 to 2028

    Why now (the evidence)

    • F-47 in development with first flight as early as 2028 and at least 185 aircraft planned
    • F/A-XX development contract of more than $20B awarded 29 Sep 2026
    • Boeing is prime on both

    Move in the next 90 days

    • Put 1 capture lead on Boeing’s fighter enterprise across F-47, F/A-XX and F-15EX
    • Close the gates for classified work first: Facility clearance, NIST SP 800-171 score, CMMC self-assessment
    • Lead with capacity that is already capitalized and first-article schedules you can prove
  3. 3. Sell affordable mass to the uncrewed aircraft builders

    Window: Now to summer 2027

    Why now (the evidence)

    • Increment 1 under production contract with 2 vendors, 4 months early
    • About 1,000 aircraft intended, more than 150 by the end of the decade
    • Increment 2 has 9 initial contracts and more than 20 eligible companies

    Move in the next 90 days

    • Quote on commercial terms: Firm fixed price, short lead time, design-to-cost
    • Take the same qualified part families to both Increment 1 primes and the Increment 2 teams
    • Bring evidence of capacity at the rates their production plans imply
  4. 4. Follow the sustainment dollar

    Window: FY2027 to FY2029

    Why now (the evidence)

    • The F-35 framework folds spares, modification kits and sustainment into the lot contracts
    • Mandatory request lists $3.0B of F-35 sustainment, 200 Block 4 kits and the Engine Core Upgrade
    • Readiness request of $190B and a fighter fleet averaging 27.4 years old
    • F/A-18E/F and EA-18G fleets move to sustainment-only

    Move in the next 90 days

    • Build repair, overhaul and spares offers for the parts you already make
    • Position for Block 4 kit and Engine Core Upgrade content
    • Pursue depot and performance-based logistics partnerships
  5. 5. Reposition rotorcraft capacity

    Window: FY2027 to FY2030

    Why now (the evidence)

    • Apache request falls from $361.7M to $1.5M and Black Hawk from $913M to $39.3M, which funds 1 aircraft
    • House bills would add Black Hawks back: 12 in appropriations and 6 in authorization
    • MV-75 receives $2.1B in development with first unit equipped in FY2030
    • CH-53K holds at 22 aircraft and $4.08B

    Move in the next 90 days

    • Quantify exposure to H-60, H-64 and H-47 new-build by part number
    • Move engineering and bids toward MV-75 and CH-53K content
    • Chase international and sustainment demand for legacy fleets
  6. 6. Use allied demand as the hedge

    Window: 2027 to 2028

    Why now (the evidence)

    • NATO allies above $1.8T in 2026, up about 11%
    • Direct commercial sales of $226.8B in FY2025, up about 13%
    • International orders sit inside the F-35 rate of 156 a year
    • About 40% of EU equipment spending is imported

    Move in the next 90 days

    • Pick 2 priority countries and 1 local partner in each
    • Shape offers around industrial participation requirements
    • Get export-control ready: Classifications, licenses and technical assistance agreements
  7. 7. Close the compliance gates before they close on you

    Window: Before 1 Jan 2027

    Why now (the evidence)

    • Full supply chain restriction on magnets, tungsten and tantalum starts 1 Jan 2027
    • China’s export-control suspension runs only to 10 Jan 2027
    • CMMC Phase II is suspended, but Phase I self-assessment and DFARS 252.204-7012 still apply and primes can still flow down Level 2

    Move in the next 90 days

    • Map magnets, tungsten and tantalum to the mine, collect supplier certifications and record which parts fall under an exception
    • Qualify a second source outside the restricted countries
    • Hold Level 2 readiness so a flow-down does not stop an award

Source: Evidence items are facts from the public record as of 18 Nov 2026. Note: The plays are Bastion Atlas analysis.

6. Dates to Watch

Exhibit 11Three of the next 6 decision points fall inside 60 daysDecision path for defense aviation suppliers (not to scale)

Source: Public laws, budget documents and program announcements listed in Exhibit 12.

Exhibit 12Decision points through 2030What happens, and why it matters to a supplier
DateEventWhy it matters
11 Dec 2026Continuing resolution (P.L. 119-103) expiresA further extension keeps FY2026 rates and, absent a specific exception, the section 102 bar on new starts, production-rate increases and certain new multiyear procurements.
1 Jan 2027DFARS 252.225-7052 extends to the full supply chainThe sourcing restriction on samarium-cobalt and neodymium-iron-boron magnets, tungsten and tantalum from China, Russia, Iran and North Korea reaches back to mining and refining, at every contract tier. Exceptions include certain commercial off-the-shelf items and nonavailability waivers.
By 3 Jan 2027Last window for a reconciliation law in the 119th CongressDecides whether any of the $350B mandatory request is funded. The House-passed budget resolution limits the Armed Services Committee to $60B of added deficits over 10 years. The Senate has not voted on its version.
3 Jan 2027120th Congress convenes with Democratic majorities in both chambersNew chairs at House and Senate Armed Services (Adam Smith, Jack Reed). Expected oversight topics at House Armed Services: Golden Dome, munitions stockpiles and government equity deals.
10 Jan 2027China’s suspension of its October 2025 export controls ends unless extended againRare-earth supply and price risk returns. The April 2025 license controls on 7 rare earths stay in force either way.
By 1 Feb 2027 (statutory date)FY2028 President’s Budget dueShows whether the FY2027 ramp carries forward. The current out-year path falls to $1.28T in FY2028 without new reconciliation money.
Summer 2027Primary mission-autonomy provider selected for Collaborative Combat AircraftSets the software baseline for about 1,000 aircraft.
2027First B-21 arrives at Ellsworth Air Force BaseStart of operational fielding. Capacity expansion is already funded.
2028 (earliest)F-47 first flightMarks the turn from development to low-rate production planning.
FY2030MV-75 first unit equippedEnd point of the Army’s shift away from legacy rotorcraft procurement.

Source: Public laws, bills, budget documents and program announcements.

What would change this view

  • Upside: A reconciliation law that funds the 53 mandatory F-35s, or appropriators adding aircraft to the regular bill.
  • Downside: A continuing resolution that runs the full year with no exception for F-35 and F-15EX production-rate increases.
  • Watch: Whether the final authorization act keeps multiyear authority for the F-35 and F-15EX, and how pricing for Lots 20 to 22 settles.

About This Report

  • Scope: US defense aviation, with allied demand where it moves US supplier order books. Data cut-off: 18 Nov 2026.
  • Evidence base: Department of War FY2027 budget documents, Congressional Research Service and Congressional Budget Office reports, the FY2027 defense authorization and appropriations bills, third-quarter 2026 results from Lockheed Martin, RTX, Northrop Grumman, Boeing and GE Aerospace, Department of War and Air Force program announcements, NATO, European Union and State Department figures, federal rules on materials, and studies from Roland Berger, Oxford Economics and Mergermarket. SONAR’s continuously updated intelligence layer was the signal source, through the 46 SONAR reports issued between 30 Aug and 18 Nov 2026.
  • Verification rule: Every figure met 1 of 2 tests before use. It was read from the primary document where that document is public, or it was confirmed in at least 2 independent accounts of an official announcement or company statement. Headline figures were then checked a second time against the source. This edition also reflects an independent line-by-line fact check, with each challenge tested against the primary document before any change was made. Figures that failed a pass were corrected or removed.
  • Request is not appropriation: Unless marked as enacted, FY2027 figures are the President’s Budget request of 3 Apr 2026. Mandatory figures depend on a reconciliation law that has not been passed.
  • Company figures: Backlog, guidance, targets and framework agreements are as stated by the companies. Framework agreements remain subject to congressional authorization and appropriations.
  • Analysis: The “Bottom Line”, section lead-ins, “So what” notes, planning cases and plays are Bastion Atlas judgment built on the facts above.

Key public documents behind the figures

  1. Department of War, FY2027 Budget Request briefing and Overview Book (April 2026)
  2. Department of War, FY2027 Mandatory Funding Overview
  3. Congressional Research Service, R49023 (FY2027 request for selected weapon systems)
  4. P.L. 119-103, Continuing Appropriations and Extensions Act, 2027 (Division A, section 102)
  5. Congressional Budget Office, cost estimate for operations against Iran (15 Sep 2026)
  6. House Appropriations Committee, FY2027 defense bill summaries (June 2026, H.R. 9495)
  7. H.R. 8800 and S. 4784 (FY2027 defense authorization bills) and H. Con. Res. 113 (House budget resolution)
  8. Lockheed Martin, RTX, Northrop Grumman, Boeing and GE Aerospace, third-quarter 2026 results (20-27 Oct 2026)
  9. Department of War and Lockheed Martin, F-35 Lots 21-30 framework announcement (22 Oct 2026)
  10. Department of War contract announcements of 29 Sep 2026 (F/A-XX, F/A-18 line shutdown, F-15EX Lot 7)
  11. Department of the Air Force, Collaborative Combat Aircraft Increment 1 announcement (17 Jun 2026)
  12. Department of the Air Force, fighter force structure report to Congress (16 Oct 2026)
  13. Department of the Air Force and Northrop Grumman, B-21 production agreement (23 Feb 2026)
  14. Office of Management and Budget, FY2027 budget out-year tables (3 Apr 2026)
  15. State Department, FY2025 arms transfer figures
  16. NATO, defense expenditure estimates for 2026
  17. Roland Berger with GIFAS, BDLI and ADS, The global aerospace supply chain in 2026 (May 2026)
  18. White & Case and Mergermarket, defense mergers and acquisitions data for the first 9 months of 2026

Intelligence built for your business

This report covers the sector. SONAR covers your business: Opportunity and intelligence briefs every week, 100% tailored to your products & services.